<div dir="ltr">Dear all<div><br></div><div>Due to the scaffolding on the Green Dragon bridge this term the following restrictions will be in place for the safety of all crews and other river users.</div><div><br></div><div>

There are traffic lights set up either side of the bridge and these must be obeyed except during events where the lights may be covered and replaced by marshals.</div><div><br></div><div>Please ensure to give plenty of room for other vessels to pass through the restricted section especially barges and other large powered craft as they are slower and less maneuverable. </div>

<div><br></div><div>In particular if waiting upstream of the bridge please stop far upstream to avoid drifting into the path of oncoming vessels.</div><div><br></div><div>Please make sure all coxes and coaches are aware of the need to leave plenty of room.</div>

<div><br></div><div>Between lighting down and 8:30am in the morning each college may only have ONE boat on the water at any time.</div><div><br></div><div>This applies to VIIIs and IVs but not to small boats (singles, pairs, doubles etc).</div>

<div><br></div><div>These restrictions will come into force when the flag is in operation from Tuesday this week.</div><div><br></div><div>Only 1st VIIIs will be permitted to boat in the first 15 minutes after lighting down. The same applies to 11am on weekends.</div>

<div><br></div><div>All crews that need a coach to be present must have 2 coaches with them on the bank. This ensures that one person can remain with the crew past the bridge obstruction as it is not possible to cross there. The other coach should cross at the white bridge along Riverside to reach the P&E.</div>

<div><br></div><div>These restrictions may be re-evaluated following consultation with the contractors and other river users to see whether there is anything that can be done to ease traffic, but for the time being keeping numbers low is important for safety and to prevent a bottleneck.</div>

<div><br></div><div>We are sorry this is necessary and we are sympathetic to how much this will disrupt your rowing this term but this is a significant obstruction. We will be attempting to find measures to alleviate any of these restrictions if it is safe to do so.</div>

<div><br clear="all"><div>Tom Grimble<div>CUCBC Honorary Secretary</div></div>